한국지반공학회:학술대회논문집 (Proceedings of the Korean Geotechical Society Conference)
- 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
- /
- Pages.1202-1205
- /
- 2009
침하예측방법들을 이용한 부산신항만 현장 침하 분석
Analysis of the settlement of Pusan New Port construction site using the settlement prediction methods
- Park, Hyun-Il (Samsung C&T, Research Center) ;
- Kim, Ha-Young (Samsung C & T, Quality Management Division)
- 발행 : 2009.09.25
초록
Embankment preloading, in conjunction with prefabricated vertical (PV) drains, was used to accelerate consolidation of marine clays in Pusan New Harbour project. UP to eightteen settlement plates were installed at the ground reclamated site under the embankment fill to monitor the preload performance. This analysis is carried out by five settlement prediction methods including the Asaoka, Hyperbolic, Hoshino, and back-analysis method based on optimization. The field settlement data can be analysed by settlement prediction methods to predict the ultimate settlement and the degree of consolidation of the reclaimed land under charge fill. The authors compared with the analyzed results of the methods.