Proceedings of the SAREK Conference (대한설비공학회:학술대회논문집)
- 2008.06a
- /
- Pages.1003-1006
- /
- 2008
A Case study on Improve of HVAC Works(IV)
기계설비 하자사례와 개선방안 연구(IV)
- Kim, Hong-Dal (Division of Customer Satisfaction Taeyoung Engineering & Construction Corporation)
- 김홍달 (주식회사 태영건설 건축사업본부)
- Published : 2008.06.25