기계설비 하자사례와 개선방안 연구(III)

A Case study on Improve of HVAC Works(III)

  • 박호영 (벽산건설주식회사 건축사업본부)
  • Park, Ho-Young (M/E Team Byucksan Engineering & Construction Co., Ltd.)
  • 발행 : 2008.06.25

초록

The purpose of this study to improve quality control and prevent repeated error.

키워드