Proceedings of the SAREK Conference (대한설비공학회:학술대회논문집)
- 2008.06a
- /
- Pages.992-998
- /
- 2008
A Case study on Improve of HVAC Works(II)
기계설비 하자사례와 개선방안 연구(II)
- Cho, Yoon-Ho (Division of Building Works Daelim Engineering & Construction Co., Ltd.)
- 조윤호 (대림산업주식회사 건축사업본부)
- Published : 2008.06.25