현장(現場)타설 콘크리트 말뚝공사의 생산성(生產性) 저하요인 분석(分析)

An Analysis on the Productivity Depreciating Factor of Cast-In-Place Piles Work

  • 이명도 (고려대학교 건축사회환경공학과) ;
  • 이현석 (고려대학교 건축사회환경공학과) ;
  • 서장우 (고려대학교 건축사회환경공학과) ;
  • 강경인 (고려대학교 건축사회환경공학과)
  • 발행 : 2008.05.09

초록

Productivity is an important factor of the construction's success and growth. However, compared to the other industries, the study of productivity in the construction industry is still insufficient. Even though the Cast-in-Place piles work is also important in construction process, the research on the productivity is not enough. So, it is necessary for the systematic research on the productivity of Cast-In-Place Piles Work. Therefore, the purpose of the study is to classify lower productivity's cause and find a way to improve these situations. This study will give the checklist for the further study of factoring and improvement of the Cast-in-Place piles work productivity.