Proceedings of the KSR Conference (한국철도학회:학술대회논문집)
- 2008.06a
- /
- Pages.2442-2447
- /
- 2008
A Case Study on Social Conflicts Of high speed Rail Construction Projects
고속철도건설사업의 사회적 갈등에 관한 사례 연구
- Published : 2008.06.12
Abstract
Concept of conflict management system and necessity of introducing it into the executing process of public projects have been subjects of any previous studies. Those systems are, however, not practically applicable to rail projects given the unique nature of rail industry. In this context, the author presented cases of conflicts emerged during the process of the Gyung bu High Speed Rail Construction Project and mapped out realistic case study applicable to construction sites.
Keywords