대한전기학회:학술대회논문집 (Proceedings of the KIEE Conference)
- 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
- /
- Pages.309-311
- /
- 2008
거시적방법에 의한 우리나라의 종합공급지장비단가 추정
Evaluation of IEAR(Interrupted Energy Assessment Rates) using Macro Approach in Korea
- Park, Jeong-Je (Gyeongsang National University) ;
- Wu, Liang (Gyeongsang National University) ;
- Choi, Jae-Seok (Gyeongsang National University) ;
- Jung, Yong-Bum (KEPRI) ;
- Yoon, Yong-Bum (KEPRI)
- 발행 : 2008.11.07
초록
This paper introduces the characteristics of relationship between probabilistic reliability (LOLE; Loss of Load Expectation) and deterministic reliability (SRR; supply reserve rate) for 2008 year in Korea power system. Korea power system has been using the LOLE criterion to determine the adequacy of installed capacity (ICAP) requirement. The criterion is that load shall not exceed the avaliable capacity, on the average, more than five day in ten years. The probabilistic reliability evaluation and production cost simulation program which is called PPHFHT was used in order to obtain the relationship in this paper.
키워드