지중 전력 선로 편단접지 시스템에서의 병행지선 및 SVL 설치방안

Installation Methodology of Parallel Ground Conductor and SVL for Single Point Bonding System on Underground Power Cable

  • Ha, C.W. (Korea Hydro & Nuclear Power Co.)
  • 발행 : 2008.11.07

초록

In underground power cable system, the device for limiting over-voltage is needed when transient over-voltage break out between sheath and ground. For this reason, the SVL(Sheath Voltage Limiter) has been applied on weak points. But the broken SVLs which are installed on the single point bonding system on underground cable are frequently found. In this paper, EMTP(Electromagnetic Transient Program) is utilized to analyze effects on the installation methodology of the parallel ground conductor and SVL for the single point bonding system on the underground cable. The result shows that the proposed installation methodology can be applied for single point bonding system and contribute for power system stabilization.