육지-제주간 2차 HVDC SYSTEM 개요

The Introduction of #2 HVDC SYSTEM

  • 발행 : 2008.11.07

초록

Cheju-Haenam HVDC transmission system start it's commercial operation since 1998. JEJU island is supplied with it's about 45% of total electric power from main land with HVDC link. In JEJU island, the demand of electric power is growing every year. With a current power supply, electric power reserve rate will be below the recommended one. For a stable power supply to JEJU island, KEPCO start a construction of #2 HVDC transmission system. This report is for introduction and understanding of #2 HVDC system which will be installed between JEJU island and main land. This report includes a specification of converter station and DC cable. KEPCO expect that this system will solve the power supply problem and maximum wind power plant capacity problem as well.