Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2008.10b
- /
- Pages.405-406
- /
- 2008
The Expectation Effects of Transferring the KPX Power IT Backup System
전력거래소 전력IT 후비시스템 이설에 따른 기대효과
- Kim, Chul-Ho (Korea Power Exchange) ;
- Park, Mun-Cheol (Korea Power Exchange) ;
- Lee, Ik-Jong (Korea Power Exchange) ;
- Kim, Yong-Soo (Korea Power Exchange)
- Published : 2008.10.31
Abstract
To maintain reliable and stable power grid the Power Dispatch Center consists of two sections, primary and backup centers. It is necessary that the Backup Dispatch Center stay away from the primary center in case of emergency like terror and natural disaster. The Backup Dispatch Center operates transmission lines outside of Seoul metropolitan area and could perform main center's role when primary center lose control Without building a duplex Power IT system, it would be doubtful to operate both centers efficiently. This paper deals with primary and backup Power IT systems which run two Dispatch Centers and focuses on expectation effects of its duplex system and transferring the Backup system.
Keywords