Application of sand compaction pile method of row replacement ratio as foundation of the dyke

호안기초로서 저치환율 모래다짐말뚝 공법의 적용

  • 진성기 ((주)에드벡트 연구소) ;
  • 김범형 (현대산업개발(주) 토목설계팀) ;
  • 김종석 (현대산업개발(주) 토목설계팀) ;
  • 임종철 (부산대학교 토목공학과)
  • Published : 2008.03.28

Abstract

In this study, sand compaction pile method was adopted to improve the soft ground under the permanent dyke, namely west sea dyke of Incheon New Port. The row replacement ratio 30% was applied to consider the ground condition, environmental side and the construction cost of the site. The stability and displacement analysis was carried out by respectively SLOPE/W and PLAXIS 2D program. Based on this analysis, it is found that the safety factor and displacement is within an allowable criteria. The model experiment was carried out using the acryl soil box with $400(H){\times}1200(L){\times}250(W)mm$ to show the displacement of the dyke and behavior of soft ground. Based on this experiment results, it is found that the settlement does not occur from 1 and 2 loading phases and horizontal displacement of 0.0075% occurs from 2 phases. It is also found that the differential settlement occurs 0.05mm corresponding respectively 0.02% and 0.03% of the dyke height(15cm).

Keywords