대한전기학회:학술대회논문집 (Proceedings of the KIEE Conference)
- 대한전기학회 2008년도 제39회 하계학술대회
- /
- Pages.38-39
- /
- 2008
서부아프리카 국가간 연계 송전망 타당성 조사
Feasibility Study for the Ghana-Mali 225kV Interconnection Project
- Kim, Jong-Hwa (Korean Electric Power Corporation) ;
- Lee, Chul-Hyu (Korean Electric Power Corporation) ;
- Lee, Young-Gil (Korean Electric Power Corporation) ;
- Choi, Sang-Ju (Korean Electric Power Corporation)
- 발행 : 2008.07.16
초록
KEPCO conducted the project called the "Feasibility Study for the Han (Ghana) - Bobo Dioulasso (Burkina Faso) - Bamako (Mali) Interconnection Project" as its first African project. This paper deals with power system analysis and Transmission line and substation design of approximately 750 kilometers of the 225 kV single circuit transmission lines and six substations. The main contents of the power system analysis results and preliminary engineering design include power flow, transient stability, eigenvalue analysis, transmission line design, substation design and economic analysis.
키워드