The Installable Maximum DG Capacity Considering LDC Parameters of ULTC and SVR in Distribution Systems

ULTC 와 SVR 이 설치된 배전계통에서 LDC Parameters 을 고려한 최대 DG 용량 산정

  • Published : 2008.07.16

Abstract

For stable and sustainable energy supply, distributed generator (DG) has become an essential and indispensable element from environmental and energy security perspectives. However, installation of DG in distribution systems may cause negative affects on feeders because power outputs of DG could be changed irregularly. One of major negative affects is variation in voltage profile. In general, voltage regulation devices such as under load tap changer (ULTC) at distribution substation and step voltage regulator (SVR) along feeder in distribution system are used to maintain customers' receiving voltage within a predetermined range. These regulators are controlled by line drop compensation (LDC) method which calls for two parameters; the equivalent impedance and the load center voltage. Therefore, consideration of DG outputs in the LDC parameter design procedure may give large impact on the installable DG capacity. This paper proposes a method that estimates maximum Installable DG capacity considering LDC parameters of ULTC and SVR. The proposed algorithm is tested with model network.

Keywords