Proceedings of KOSOMES biannual meeting (해양환경안전학회:학술대회논문집)
- 2007.11a
- /
- Pages.9-14
- /
- 2007
Variation of Current by the Building of Artificial Upwelling Structure(II)
인공용승구조물 설치에 의한 유동변화(II)
- Hwang, Suk-Bum (Research Center for Ocean Industrial and Development(RCOID), Pukyong National University) ;
- Kim, Dong-Sun (Research Center for Ocean Industrial and Development(RCOID), Pukyong National University) ;
- Bae, Sang-Wan (Research Center for Ocean Industrial and Development(RCOID), Pukyong National University) ;
- Kheawwongjan, Apitha (Interdisciplinary Program of Ocean Industrial Engineering, Pukyong National University)
- Published : 2007.11.29
Abstract
To illusσ'ate the variation of current around artificial upwelling structure which is located in the South sea of Korea, current measurements using ADCP (Acoustic Doppler Current Profiler) during neap and spring tides were carried out on 27th July(summer), 14th October and 30th November(Autumn), 2006. Current after the set up of artificial upwelling structure were shown different in the upper and lower layer, the boundary between the upper and lower layer was at
한국 남해안 거제도 앞바다에 구축된 인공용승구조물로 인하여 발생하는 유동 변화를 파악하기 위해 ADCP(Acoustic Doppler Current Profiler)를 이용한 정선관측을 2003년 하계 및 추계에 실시하였다. 관측 결과 하계에는 수심 약
Keywords