The Evaluation of the Loads Acting on the Pillar in Two-Arch Tunnel

2-Arch 터널의 중앙벽체에 작용하는 하중산정

  • 도종남 (한양대학교 대학원 토목공학과) ;
  • 오규철 (경남기업(주)) ;
  • 천병식 (한양대학교 공과대학 토목공학과)
  • Published : 2007.05.17

Abstract

In this study, Matsuda's formula, which has been used to evaluate the acting load on the concrete pillar in 2-Arch tunnels, is investigated and a load reduction factor $({\alpha})$, which has been estimated from numerical parametric studies, is proposed for a better design of 2-Arch tunnels in the future. Numerical parametric studies show that the concrete pillar is subjected to a stress concentration on the excavation side during the first tunnel driving and when tunnel excavation is completed, the induced stress on the pillar in a poor quality of ground condition is 1.5 to 1.8 times the stress developed during the first tunnel driving. In addition, the numerical studies indicate that the acting load on the pillar is in the range of $14{\sim}83%$ of the load estimated by Matsuda's formula. From these results, a load reduction factor $({\alpha})$ is determined and it would make 2-Arch tunnel design more economically.

Keywords