Spent Fuel and Waste Management Activities For the Cleanout of the 105F Fuel Storage Basin at HANFORD

  • Morton, Mark-R. (Polestar Applied Technology Inc.) ;
  • Rodovsky, Tomas J. (Polestar Applied Technology Inc.) ;
  • Lee, Sun-Kee (Hyundai Engineering Company Ltd.)
  • Published : 2007.05.31

Abstract

Cleanout of the F Reactor Fuel Storage Basin (FSB) is an element of the FSB decontamination and decommissioning (D&D) and is required to complete interim safe storage (ISS) of the F Reactor. Following reactor shutdown and in preparation for a deactivation layaway action in 1970, the water level in the FReactor FSB was reduced to approximately 0.6 m (2 ft) over t]to floor. Basin components and other miscellaneous items were left or placed in the FSB. The item placement was performed with a sense of finality, and no attempt was made to place the items in an orderly manner. The F Reactor FSB was then filled to grade level with 6(20of local surface material (essentially a fine sand). The reactor FSB backfill cleanout has the potential of having to remove spent nuclear fuel (SNF) that may have been left unintentionally. Based on previous cleanout of six water-filled FSBs with similar designs (i.e., the B, C, D, and DR FSBs in the 1980's), it was estimated that up to five SNF elements could be discovered in the F FSB (I). In reality about 17 full SNF elements were found in the excavation. This paper covers the technical and programmatic challenges of performing this decommissioning effort with some of the controls used for SNF management. The paper also will highlight how many various technologies were married into a complete package to address the issue at hand and show how no one tools could complete the job, but combined, good progress is being made.

Keywords