Setting Out of Construction Works Using GPS Geoid Height.

GPS 지오이드고를 이용한 측설시공

  • Published : 2007.04.19

Abstract

This investigation aims at calculating the geoid height, distance between the ellipsoidal height and the orthometric height by GPS/Levelling data for nationwide 58 Bench Marks, and calculating the effect of geoid height to engineering public works. The accuracy of the results from baseline analyses and adjustment of a network. using GPS surveying data by nationwide 58 BM show 4mm for horizontal direction and 7cm for vertical direction. The 58 geoid height was calculated by GPS/Levelling. For a construction work field GPS/Levelling for distributed 4 BM in test area can calculate the orthometric height in 20 ppm relativity accuracy with 95% reliability. Besides the calculated geoid height in the investigation was 0.367m higher than EGM96 model. The test results of a engineering work site, the result by EGM96 model was 1.8cm in 10km and it was also 3.6cm in interpolation method. The results show that it is equivalent to levelling of $20mm\sqrt{S}$.

Keywords