A Construction Case of Massive Foundation for High Rise Building (A Case of Barrette Pile)

초고층 건축물 대형기초의 시공 사례 (바레트 말뚝 중심)

  • Published : 2007.09.14

Abstract

The trend of current urban redevelopment and new city development project shows that the superstructure of building is getting larger and higher in consequence of a limited plottage condition and the preference of landmark. For this reason, it is definitely required to extend pile diameter and install the pilein deep foundation to support superstructure. The pile method causes construction-related problems such as increasing quantities, difficulty of storage & transportation material and decreasing design load while construct pile in deep foundation. The Bored Pile method has applied to minimize those problems. As above shown, this article will be presented construction case study of Barrette Pile and R.C.D in order to make a counterproposal for the quality control of a large building foundation work.