IED 적합성 인증시험 장치 구축

Construction of IED Conformance Testing System

  • 이남호 (한국전력공사 전력연구원) ;
  • 김지희 (한국전력공사 전력연구원) ;
  • 장병태 (한국전력공사 전력연구원) ;
  • 안용호 (한국전력공사 전력연구원) ;
  • 황갑철 (한국전력공사 전력연구원)
  • Lee, N.H. (KEPCO Korea Electric Power Research Institute) ;
  • Kim, J.H. (KEPCO Korea Electric Power Research Institute) ;
  • Jang, B.T. (KEPCO Korea Electric Power Research Institute) ;
  • An, Y.H. (KEPCO Korea Electric Power Research Institute) ;
  • Hwang, K.C. (KEPCO Korea Electric Power Research Institute)
  • 발행 : 2007.07.18

초록

In order to construct a digital substation based on IEC61850, All of the utility company should used IEDs to be verified and also vendors should get a certification from the international conformance testing organizationsuch as KEMA. So KEPRI in charge of POWER IT project related to SAS was required to IED conformance testing system, which can perform the test previously. The system, KEPCO developed, consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator etc