Simultaneous operation of two group of Auxiliary Block for Korean High Speed Train

고속전철용 보조전력변환장치 1,2군 동시 기동

  • 조현욱 ((주)로템 기술연구소 전장품개발팀) ;
  • 김연충 ((주)로템 기술연구소 전장품개발팀) ;
  • 김태환 ((주)로템 기술연구소 전장품개발팀) ;
  • 장경현 ((주)로템 기술연구소 전장품개발팀) ;
  • 최종묵 ((주)로템 기술연구소 전장품개발팀)
  • Published : 2007.11.08

Abstract

Power Car PC1 and PC2 of Korean high speed train have a auxiliary block which consists of two PWM converter respectively. If a auxiliary block happens a critical failure, the other supplies power to full load of train. In this case, a stability of auxiliary block reduces by a increasing load. For increasing a stability of auxiliary block and train system, a auxiliary block consists of two group four PWM converter which operates simultaneously. If a group of a auxiliary block happens a critical failure, the other supplies power to load of a auxiliary block. This paper describes a method for simultaneous movement of auxiliary block which consists of two group four PWM converter.

Keywords