Proceedings of the KSRS Conference (대한원격탐사학회:학술대회논문집)
- Volume 1
- /
- Pages.263-266
- /
- 2006
- /
- 1226-9743(pISSN)
A STUDY ON THE EAST/WEST STATION KEEPING PLANNING CONSIDERING WHEEL OFF-LOADING
- Lee, Sang-Cherl (COMS Project Office, Korea Aerospace Research Institute) ;
- Park, Bong-Kyu (COMS Project Office, Korea Aerospace Research Institute) ;
- Kim, Bang-Yeop (COMS Project Office, Korea Aerospace Research Institute) ;
- Ju, Gwang-Hyeok (COMS Project Office, Korea Aerospace Research Institute) ;
- Yang, Koon-Ho (COMS Project Office, Korea Aerospace Research Institute)
- Published : 2006.11.02
Abstract
Now, on the developing COMS(Communication, Ocean and Meteorological Satellite) has solar panel on the South panel only. Therefore, the wheel off-loading has to be performed periodically to reduce a induced momentum energy by a asymmetric solar panel. One of two East/West station keeping maneuver to correct simultaneously longitude and eccentricity, orbit corrections may be performed during one of the two wheel off-loading manoeuvres per day to get enough observation time for meteorological and ocean sensor. In this paper, we applied a linearized orbit maneuver equation to acquire maneuver time and delta-V. Nonlinear simulation for the station keeping is performed and compared with general station keeping strategy for fuel reduction.
Keywords
- Geostationary Orbit;
- Orbit Maneuver;
- Station Keeping;
- Wheel Off-Loading;
- Solar Sail;
- Solar Panel;
- Meteorological Satellite