High performance MRP(Material Requirement Planning) system based on tree-structured BOM(Bill of Material)

트리 구조의 BOM(Bill of Material)에 기초한 고성능 MRP(Material Requirement Planning) 시스템

  • Published : 2006.05.01

Abstract

The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans.

Keywords