Determination of joint production and delivery policy with multiple production lines for multiple products

  • Kim, Tae-Bok (Graduate School of Logistics, University of Incheon) ;
  • Hong, Yu-Shin (Division of Mechanical and Industrial Engineering, POSTECH)
  • 발행 : 2006.11.17

초록

Satisfying the customer orders with a short lead-time is one of the essential and competitive factors for business units under a mass customization environment. To shorten the lead-time for fulfilling various orders entails the production capacity expansion and efficient operational policy. Most business firms utilize the multiple production lines or facilities to cope with this business and manufacturing environment by making the manufacturing and distribution more flexible. In this study, we introduce the operational problem determining the joint production and delivery policy in an environment where multiple products are manufactured with more than one production lines. Also, we propose the heuristic solution approach for determining the product-line selection and joint lot size for this problem.

키워드