Proceedings of the Korea Water Resources Association Conference (한국수자원학회:학술대회논문집)
- 2006.05a
- /
- Pages.918-922
- /
- 2006
Flood Control Operation Model of Reservoir Using CSUDP
CSUDP를 이용한 홍수기 댐운영
- Published : 2006.05.18
Abstract
The purpose of this study is development of operation model for flood control of multi-reservoir in river basin, which can provide the best decision of reservoir release in timely and appropriately manner using CSUDP. For verification and validation of the developed system, the Gum River Basin was selected, which has 82 rainfall gauging stations, 28 water level gauging and 2 multi-purpose reservoirs which can control flood. There was a successful simulation of the developed model and system, using the real-time data from the Han River Basin Flood Forecast Center. Specially, case study for '1995 flood was performed.