Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2006.03a
- /
- Pages.1120-1125
- /
- 2006
Study on Constructibility considering Changes of Groundwater Level in Kwang Yang port
광양지역 지하수위 변화를 고려한 시공성에 관한 연구
- Kim, Byeong-Ho (Sekwang Engineering Consultants Co., Ltd.) ;
- Yang, Tae-Seon (Dept. of Constructionl Information, Kimo College) ;
- Lee, Song (Dept. of Civil Engineering, University of Seoul)
- Published : 2006.03.24
Abstract
Larger area will be constructed in a harbor land and container terminal which are constructed in reclaimed land using the dredged materials. Soil improvement work is to be carried out including constructibility, in which is monitoring devices, measuring frequency, installations etc. The ground water tables in the reclaimed area are affected by the several factors which are design reclamation level, consolidation settlement, remaining surcharge pressure and remaining excess pore water pressure. The plan wii be drawn up in which monitoring results for the ground water tables are capable to provide the reliable ground water table when designers and civil engineers construct the harbor structures considering constructibility.