양성자 가속기 연구센터 관련 전력설비 설계 현황

Electric Power System Design Status for the Proton Accelerator Conventional Facilities of PEFP

  • 문경준 (한국원자력연구소 양성자기반공학기술개발사업단) ;
  • 전계포 (한국원자력연구소 양성자기반공학기술개발사업단) ;
  • 민의섭 (한국원자력연구소 양성자기반공학기술개발사업단) ;
  • 남정민 (한국원자력연구소 양성자기반공학기술개발사업단) ;
  • 김준연 (한국원자력연구소 양성자기반공학기술개발사업단) ;
  • 김보현 ((주)한국전력기술) ;
  • 정우성 ((주)한국전력기술) ;
  • 유석태 ((주)한국전력기술)
  • Mun, K. (Korea Atomic Energy Research Institute Proton Engineering Frontier Project) ;
  • Jeon, G.P. (Korea Atomic Energy Research Institute Proton Engineering Frontier Project) ;
  • Min, Y.S. (Korea Atomic Energy Research Institute Proton Engineering Frontier Project) ;
  • Nam, J.M. (Korea Atomic Energy Research Institute Proton Engineering Frontier Project) ;
  • Kim, J.Y. (Korea Atomic Energy Research Institute Proton Engineering Frontier Project) ;
  • Kim, B.H. (Korea Power Engineering Company, INC.) ;
  • Jeong, W.S. (Korea Power Engineering Company, INC.) ;
  • Yoo, S.T. (Korea Power Engineering Company, INC.)
  • 발행 : 2006.07.12

초록

90년대에 들어서면서부터 미래원천기술 개발에 필요한 양성자원 및 중성자원의 중요성이 부각됨으로써, 이에 적합한 고에너지(수백 MeV${\sim}$수 GeV) 및 대전류(수십 mA)의 대형 양성자 가속기가 개발되어 반도체 생산, 의료장비 등 여러 분야에 널리 적용되고 있는 추세이다[1, 2]. 이에 양성자 사업단은 21세기 미래 원천기술을 개발하고 산업경쟁력을 제고하며 공공복지를 증진시킬 수 있는 양성자가속기를 개발하여, NT, BT, IT, ST등 중요 국가과학기술분야의 발전기반을 확충하기 위한 프론티어 사업목표로 하고 있으며 이에 부응할 수 있는 양성자 가속기 연구센터 건설계획을 설정하여 추진 중에 있다. 본 논문에서는 양성자 가속기 연구센터 건설계획 과정 중에서 전력설비 설계 방법, 즉 154kV 수전 설비, 직류전원계통, 무정전 전원계통 설비, 접지 및 피뢰설비의 기능 및 특징에 관해 기술하고자 한다.