Welding Quality Evaluation on the LASER Welding Parts of the Spacer Grid Assembly for PWR fuel Assembly

경수로 원전연료용 지지격자의 LASER 용접품질 평가

  • Published : 2005.06.23

Abstract

Nuclear fuel assemblies for pressurized water reactors(PWR) are loaded in the reactor core throughout the residence time of three to five years. A spacer grid assembly, which is an interconnected array of slotted grid straps and is welded at the intersections to form an egg crate structure, is one of the main structural components of the nuclear fuel assembly. The spacer grid assembly is structurally required to have enough buckling strength under various kinds of lateral loads acting on the nuclear fuel assembly so as to keep the nuclear fuel assembly straight. To meet this requirement, it is necessary to weld the welding parts carefully and precisely. In this study, laser welding qualities of the spacer grid assembly welded by several welding companies, such as weld strength, weld penetration depth, and weld bead size, are examined and compared.

Keywords