Improvement of Load Following Operation by Governor Control Logic Modification of the Thermal Power Plant (1)

기력발전소 조속기의 제어개선에 의한 발전기 부하추종성의 향상 (1)

  • Published : 2005.07.04

Abstract

The improvement of load following operation of the thermal power plant is influenced to the electrical quality. Analysis of boiler, turbine, and governor system, and the study of control algorithm are preceded. The thermal power plant is operated by various control systems. In the case of faulty governor system, it takes long days to solve the problem and impossible to repair the mechanism without outage. A non-planned out-age is taken into consideration because of economical power production. In this paper, to clear the continuous swings of an old turbine governor system(YEOSU #1), the trend, the control logic, and the hydraulic mechanism are analyzed, and then the control circuit with ADAPT function and the 1st order lag circuit are inserted and modified. After that, the power plant comes to automatic governor control operation.