시뮬레이션을 이용한 백라이트유닛의 생산공정예측

A Simulation on The BLU Assembly Line

  • 김승남 (아주대학교 대학원 산업공학과) ;
  • 문제창 (TMI 컨설팅) ;
  • 임석철 (아주대학교 산업정보시스템공학부)
  • 발행 : 2005.05.13

초록

Many corporation invest in LCD industry because of The growth of it. Back Light Unit(BLU), LCDs' main part take 20% of its product costs. In this paper we proposed simulation model that is in the process of introducing an equipment, We try to apply a simulation model in the BLU Assembly line by using ARENA. We make BLU Assembly line with various part storage, product strorage. etc. We evaluate Logistics in Assembly Line, and forecast bottleneck and throughput

키워드