도심지 지하상가 연결통로 DSM(Divided Shield Method)공법 적용사례 연구

A Study of Applications of DSM in tunnelling to an underground shopping-area

  • 홍창수 (삼성물산(주) 건설부문 기술연구팀) ;
  • 황대진 (삼성물산(주) 건설부문 기술연구팀) ;
  • 이강호 (삼성물산(주) 건설부문 TA팀) ;
  • 조금식 (삼성물산(주) 건설부문)
  • 발행 : 2005.10.07

초록

Recently, it is used to join an building to an underground shopping-area in urban. When we construct Seo-Cho Complex building which is in Seoul, we also construct an underground passage to the Gangnam underground shopping-area. But it is difficult to excavate in the downtown area, because excavations induce traffic jam and public discontent. Considering safety, a confined area, settlements, we decided to use DSM(Divided Shield Method) which is based on messer shield. This paper will produce our experience and the results provide a useful guide in a connection tunnel

키워드