한국지반공학회:학술대회논문집 (Proceedings of the Korean Geotechical Society Conference)
- 한국지반공학회 2005년도 지반공학 공동 학술발표회
- /
- Pages.556-563
- /
- 2005
도심지 지하상가 연결통로 DSM(Divided Shield Method)공법 적용사례 연구
A Study of Applications of DSM in tunnelling to an underground shopping-area
- Hong, Chang-Soo (R&D Team, Samsung Corporation) ;
-
Hwang, Dae-Jin
(R&D Team, Samsung Corporation) ;
- Lee, Kang-Ho (TA Team, Samsung Corporation) ;
- Cho, Keum-Sik (Samsung Corporation)
- 발행 : 2005.10.07
초록
Recently, it is used to join an building to an underground shopping-area in urban. When we construct Seo-Cho Complex building which is in Seoul, we also construct an underground passage to the Gangnam underground shopping-area. But it is difficult to excavate in the downtown area, because excavations induce traffic jam and public discontent. Considering safety, a confined area, settlements, we decided to use DSM(Divided Shield Method) which is based on messer shield. This paper will produce our experience and the results provide a useful guide in a connection tunnel