국제학술발표논문집 (International conference on construction engineering and project management)
- The 1th International Conference on Construction Engineering and Project Management
- /
- Pages.796-801
- /
- 2005
- /
- 2508-9048(eISSN)
INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM
- Yuan Jianbo (College of Highway Engineering,Changsha University of Science and Technology) ;
- Liu Weijun (College of Highway Engineering,Changsha University of Science and Technology) ;
- Zhang Jianren (College of Bridge and Structure, Changsha University of Science and Technology)
- 발행 : 2005.10.16
초록
Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..
키워드