International conference on construction engineering and project management (국제학술발표논문집)
- 2005.10a
- /
- Pages.633-637
- /
- 2005
- /
- 2508-9048(eISSN)
MULTIFACTOR MODELLING IN CONSTRUCTION MANAGEMENT
- Leszek Janusz (ViaCon Polska) ;
- Oleg Kaplinski (Institute of Structural Engineering, Poznan University of Technology)
- Published : 2005.10.16
Abstract
The paper presents a multifactor modelling of construction processes. There are three phases of the proposed extended procedure. Tools for these phases from chronometric test to verifying of the assumed model are indicated. Apart from the classic verification activities the method of artificial neural networks has been successfully applied. The paper presents the usage of these tools to model the process of assembly of structural corrugated steel plate structures.