To date, the IEA DSM Programme has not undertaken any work on the potential for DSM to cost-effectively relieve electricity network constraints Such constraints are becoming a significant problem in countries where electricity demand is increasing and network infrastructure ('poles and wires') is ageing. As loads grow and infrastructure reaches the end of its economic life, the potential cost of augmenting electricity networks is increasing exponentially. In many situations, network-driven DSM can delay the need for network augmentation. In some limited situations, mainly at the distribution level, network-driven DSM may be able to cost-effectively eliminate the requirement to build a 'poles and wires' solution. In this paper, the concept of network-driven DSM program is surveyed.