Development of the Cement Mortar Grouting type Paved Track for Existing Line

기존선용 시멘트 모르터 충진형 포장궤도의 개발

  • 이일화 (한국철도기술연구원 궤도토목연구본부) ;
  • 이희업 (한국철도기술연구원 궤도토목연구본부) ;
  • 이준석 (한국철도기술연구원 궤도토목연구본부) ;
  • 이진욱 (한국철도기술연구원 궤도토목연구본부)
  • Published : 2005.11.01

Abstract

When the high-speed train running on the track, there is a speed limit which track distortion is unusually increased according to condition of track and roadbed. This speed limit is called critical velocity, and physical parameter value increased very greatly. These phenomenon happened as high-speed train were developed, studied regularly through TGV 100 running test in France. As research result until now, the main reason is soft roadbed's capacity. Wave propagation and track support capacity is varied by the site characteristics. This paper achieved theoretical examination about resonance band(speed and frequency) that occurred in roadbed on the base rock in point of geotechnical engineering. The examination of resonance divides with ground response analysis, critical band analysis by the shear wave velocity of roadbed, train critical speed through the ground stratum.

Keywords