Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2005.07a
- /
- Pages.653-657
- /
- 2005
Research for Installation and Operation of High Temperature Superconducting Cable System
고온 초전도 케이블 시스템 설치 밀 운전을 위한 연구
- Choi, Hyung-Sik (Korea Electric Power Research Institute) ;
- Sohn, Song-Ho (Korea Electric Power Research Institute) ;
- Hwang, Si-Dole (Korea Electric Power Research Institute)
- Published : 2005.07.18
Abstract
The commercial contract was made firstly in the world for one set of high temperature superconducting(HTS) cable system between buyer, Korea Electric Power Research Institute and seller, Sumitomo Electric Industries, Ltd. in August 2004. After fabrication, test and examination, the HTS cable system will be installed at the KEPRI's test field in Gochang, Jeonbuk province from the time of July 2005. KEPRI is preparing measurement and test facilities for field test of the HTS cable system and carrying out researches into the design and construction of superconducting cable test building, evaluation of cooling performance, measurement of AC loss, analysis of the quench phenomena due to excess current and means of linking the HTS cable system to the existing electric power supplying system. The constitution of, the method to install and the plan of test operation of the HTS cable system will be presented in this paper.
Keywords