Analysis of Anticipated Operational Occurrences for 3-Pin Fuel Test Loop

  • Park, S.K. (Korea Atomic Energy Research Institute) ;
  • Chi, D.Y. (Korea Atomic Energy Research Institute) ;
  • Shim, B.S. (Korea Atomic Energy Research Institute) ;
  • Park, K.N. (Korea Atomic Energy Research Institute) ;
  • Ahn, S.H. (Korea Atomic Energy Research Institute) ;
  • Lee, J.M. (Korea Atomic Energy Research Institute) ;
  • Lee, C.Y. (Korea Atomic Energy Research Institute) ;
  • Kim, Y.J. (Korea Atomic Energy Research Institute)
  • 발행 : 2004.10.28

초록

The performance of the ECWS was predicted for the anticipated operational occurrences. The inadvertent close of loop isolation valve is the most severe case for the five anticipated operational occurrences considered in this design and meets the design criteria of the ECWS. The correlation of critical heat flux for the geometry of three pins sub-channel analysis will be studied in the feature.

키워드