한국지반공학회:학술대회논문집 (Proceedings of the Korean Geotechical Society Conference)
- 한국지반공학회 2004년도 춘계학술발표회
- /
- Pages.930-937
- /
- 2004
고속도로 터널에 대한 전단면 발파 설계방안 연구
Design guide for full-face blasting in highway tunnel
- Lee, Sang-Don (Korea Highway Corporation) ;
- Choi, Hae-Moon (Samsung Engineering & Construction) ;
- Lee, Hyun-Koo (Samsung Engineering & Construction) ;
- Ryu, Chang-Ha (KIGAM)
- 발행 : 2004.03.25
초록
In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.