한국해양공학회:학술대회논문집 (Proceedings of the Korea Committee for Ocean Resources and Engineering Conference)
- 한국해양공학회 2004년도 학술대회지
- /
- Pages.45-50
- /
- 2004
케이슨식 교량기초 제작 및 거치 시공사례 -울산 신항 방파제현장 시공 사례를 중심으로-
A Case Study of Caisson Typed Bridge-Foundation Fabrication and Installation in Ul-san Newport Breakwater Project
- JANG BYUNG-SOO (Samsung Corporation(E & C Group), Ul-san Newport Breakrmter Site) ;
- SIN SUNG-GWEN (Samsung Corporation(E & C Group), Ul-san Newport Breakrmter Site) ;
- KIM DUCK-HO (Samsung Corporation(E & C Group), Ul-san Newport Breakrmter Site)
- 발행 : 2004.11.01
초록
The method of caisson typed bridge-foundation fabrication and installation applied in Ul-san newport breakwater project is throughly carried out to compact QRR mound vibro-hammer step by step to minimize settlement through stability check. Floating Dock was mobilized for caisson fabrication due to limited site area. fabricated caisson on the Floating Dock was towed to the deeper area of 8m water depth to be launched, and Floating Crane assisted launching and installation work of the caisson. finally water filling was done followed by surveying work to permanent installation.
키워드