A Case Study of Caisson Typed Bridge-Foundation Fabrication and Installation in Ul-san Newport Breakwater Project

케이슨식 교량기초 제작 및 거치 시공사례 -울산 신항 방파제현장 시공 사례를 중심으로-

  • JANG BYUNG-SOO (Samsung Corporation(E & C Group), Ul-san Newport Breakrmter Site) ;
  • SIN SUNG-GWEN (Samsung Corporation(E & C Group), Ul-san Newport Breakrmter Site) ;
  • KIM DUCK-HO (Samsung Corporation(E & C Group), Ul-san Newport Breakrmter Site)
  • 장병수 (삼성물산(건설부문)울산신항방파제현장) ;
  • 신성권 (삼성물산(건설부문)울산신항방파제현장) ;
  • 김덕호 (삼성물산(건설부문)울산신항방파제현장)
  • Published : 2004.11.01

Abstract

The method of caisson typed bridge-foundation fabrication and installation applied in Ul-san newport breakwater project is throughly carried out to compact QRR mound vibro-hammer step by step to minimize settlement through stability check. Floating Dock was mobilized for caisson fabrication due to limited site area. fabricated caisson on the Floating Dock was towed to the deeper area of 8m water depth to be launched, and Floating Crane assisted launching and installation work of the caisson. finally water filling was done followed by surveying work to permanent installation.

Keywords