Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference (한국조명전기설비학회:학술대회논문집)
- 2004.05a
- /
- Pages.335-340
- /
- 2004
The Analysis of Field Condition for Power Receiving System and Patch and Panel Boards at Construction Sites
건설현장의 수전설비 및 배.분전반의 현장실태 분석
- Gil, Hyoung-Jun (Electrical Safety Research Institute attached to Korea Electrical Safety Corporation) ;
- Han, Woon-Ki (Electrical Safety Research Institute attached to Korea Electrical Safety Corporation) ;
- Kim, Hyang-Kon (Electrical Safety Research Institute attached to Korea Electrical Safety Corporation) ;
- Choi, Chung-Seog (Electrical Safety Research Institute attached to Korea Electrical Safety Corporation)
- 길형준 (한국전기안전공사 부설 전기안전연구원) ;
- 한운기 (한국전기안전공사 부설 전기안전연구원) ;
- 김향곤 (한국전기안전공사 부설 전기안전연구원) ;
- 최충석 (한국전기안전공사 부설 전기안전연구원)
- Published : 2004.05.07
Abstract
To analyze risk factors of temporary power installations, the investigation was carried out for power receiving system and pack and panel boards at construction sites. The subject was variable such as an airport, an apartment, a municipal playground. There are many risk factors caused by inadequate working environments and the deterioration of temporary power installations using equipment with minimum safety devices at construction sites. There, it is intended to present problems and preventive measures against electrical shock accidents, through analyzing risk factors of real field condition and investigating temporary power installations all over the country.
Keywords