국내 전기공사 분야 실적공사비 적산제도 도입시 간접공사경비의 산정방안

Estimation method of Overhead Costs for Historical Costs Estimation System of the Electrical Construction Works in Korea

  • Sohn, H.K. (KERI(Korea Electrotechnology Research Institute)) ;
  • Lee, H.K. (KERI(Korea Electrotechnology Research Institute)) ;
  • Park, M.Y. (KERI(Korea Electrotechnology Research Institute)) ;
  • Park, I.P. (KERI(Korea Electrotechnology Research Institute)) ;
  • Kwon, Y.M. (KECA(Korea Electrical Contractors Association)) ;
  • Seo, S.S. (KECA(Korea Electrical Contractors Association)) ;
  • Kim, K.G. (KECA(Korea Electrical Contractors Association)) ;
  • Kim, J.H. (KECA(Korea Electrical Contractors Association))
  • 발행 : 2004.05.28

초록

When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system fur building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is supposed to reasonable estimation methods of overhead costs and profits.

키워드