4D-CAD시스템의 공사정보관리 효율화방안

Improved Methodology of Construction Information Management in 4D CAD System

  • 발행 : 2004.06.01

초록

Recently. our construction industry is using 4D-CAD system but the public Database (DB) for the 4D-CAD system is insufficiently built. It is difficult to connect 4D-CAD system information such as schedule, drawings. Therefore this study suggest a methodology to link the 4D-CAD system information with work breakdown structure(WBS) and the methodology suggested in this study was applied to a 4D-CAD system

키워드