A Fundamental Study on the Float Application of Construction Schedule Management

건설 프로젝트 공정관리에 있어서 Float 활용에 대한 기초연구

  • Published : 2003.05.01

Abstract

Float has been just recognized spare time for disposing of unexpected conditions as by-product of CPM(critical-path-method) calculations, in spite of important method for construction period, taking in material, human supply and cost reducation in construction process management. Also float necessary follow method of contract by ownership problem and effect construct management of use. The purpose of this study was to examine current recognition and application grade of float in construction project. In addition, the study proposes improvement strategies of float application for efficient progress plan and control.

Keywords