Verification Test for Primary Reactor Piping in Nuclear Power Plant

원자로 주 배관계의 진동 건전성 시험

  • Published : 2002.11.01

Abstract

The piping verification tests were performed in order to verify the structural integrity during initial operation of the reactor coolant systems and the primary heat transportation systems of nuclear power plants by KEPRI in Korea. The tests were conducted at full operating temperature and pressure. The objective is to evaluate the possibility of excessive load generating on piping, piping supports, and reactor structures etc. in the steady normal operation and expected pump transient conditions. As a result, the measured vibrations have been shown acceptable level according to ASME/ANSI OMa-Standard, Part 3.