765kV 변전소 시운전에 관한 고찰

Consideration on the trial operation of 765kV substation

  • 변강 (한국전력공사 전력계통건설처) ;
  • 정시환 (한국전력공사 전력계통건설처) ;
  • 박근원 (한국전력공사 전력계통건설처) ;
  • 이상면 (한국전력공사 전력계통건설처) ;
  • 최만식 (한국전력공사 전력계통건설처)
  • Byun, Gang (Power System Construction Office Korea Electric Power Corporation) ;
  • Jung, S.H. (Power System Construction Office Korea Electric Power Corporation) ;
  • Park, K.W. (Power System Construction Office Korea Electric Power Corporation) ;
  • Lee, S.M. (Power System Construction Office Korea Electric Power Corporation) ;
  • Choi, M.S. (Power System Construction Office Korea Electric Power Corporation)
  • 발행 : 2002.11.15

초록

Purpose of the 765kV trial operation conducted for the first time in our country are performance verification of domestic developed equipment(765kV M.Tr, GIS,etc) and extraction of problem in advance to commercial operation and cultivation of operation ability. The trial operation of 765kV substation was finished successfully under the positive supports of institutes. manufactures. and constructers. It is expected that extraction of problems in advance and accumulation of operation techniques through the trial operation of 765kV substation will be contributed largly to the realization of the without a hitch operation of 765kV system.

키워드