대한전기학회:학술대회논문집 (Proceedings of the KIEE Conference)
- 대한전기학회 2002년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
- /
- Pages.133-138
- /
- 2002
불연속 에너지 발생장치의 에너지 보상 시스템에 대한 연구
A Study on the Discontinuous Energy Ceneration System for Power Compensation
- Lee, Jeong-Il (Dept. of Electrical & Electronic Eng. Dongshin univ.) ;
- Lim, Jung-Yeol (Dept. of Electrical & Electronic Eng. Dongshin univ.) ;
- Kang, Byung-Bog (Dept. of Electrical & Electronic Eng. Dongshin univ.) ;
- Cha, In-Su (Dept. of Electrical & Electronic Eng. Dongshin univ.)
- 발행 : 2002.04.25
초록
The developments of the solar and the wind power energy are necessary since the future alternative energies that have no pollution and no limitation are restricted. Currently power generation system of MW scale has been developed, but it still has a few faults with the weather condition. In order to solve these existing problems, combined generation system of photovoltaic(400W) and wind power generation system(400W) was suggested. It combines wind power and solar energy to have the supporting effect from each other. However, since even combined generation system cannot always generate stable output with ever-changing weather condition, power compensation device that uses elastic energy of spiral spring to combined generation system was also added for the present study. In an experiment, when output of system gets lower than 12V(charging voltage), power was continuously supplied to load through the inverter by charging energy obtained from generating rotary energy of spiral spring operates in small scale generator.
키워드