Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2002.11d
- /
- Pages.106-108
- /
- 2002
Design of Capacitor Load Bank for Capacitive Current Switching Tests
진상소전류시험용 Capacitor Load Bank 설계
- Roh, Chang-Il (Korea Electrotechnology Research Institute) ;
- La, Dae-Ryeol (Korea Electrotechnology Research Institute) ;
- Kim, Sun-Koo (Korea Electrotechnology Research Institute) ;
- Jung, Heung-Soo (Korea Electrotechnology Research Institute) ;
- Kim, Won-Man (Korea Electrotechnology Research Institute) ;
- Lee, Dong-Jun (Korea Electrotechnology Research Institute)
- Published : 2002.11.14
Abstract
Capacitive current switching test for circuit breaker and load breaker switch requires special attention because, after current interruption, the capacitive load contains an electrical charge and can cause dielectric restrike and re-ignition of the switching devices. therefore dielectric strength of capacitor load bank shall be able to withstand 4Vt (Vt : test voltage) and charging voltage discharged within 1 min. In this paper presents both characteristic of capacitive current switching tests and design of capacitor load bank.
Keywords