Proceedings of the KWS Conference (대한용접접합학회:학술대회논문집)
- 2002.10a
- /
- Pages.342-348
- /
- 2002
STATUS OF WELDING FOR POWER PLANT FACILITIES
- Hur, Sung-do (Research Development Center, Doosan Heavy Industries & Construction Co., Ltd.)
- Published : 2002.10.01
Abstract
The welding technology for production of power plant facility as for other industries has been progressing forward automation and mechanization for cost reduction and shortening of cycle time. The welding for boiler tube is automated or mechanized as the parts and subassemblies of tubes are conveyed automatically in the shop. The temperature of boiler stearn is being progressively increased for higher plant efficiency. The welding of nuclear component is characterized by heavy thickness and narrow gap Submerged Arc Welding. Narrow gap Gas Metal Arc Welding and Electron Beam Welding is applied to turbine diaphragm. To improve the resistance of solid particle erosion of turbine blade and nozzle partition, HVOF spray technology and boriding process has been applied.