Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2002.03a
- /
- Pages.413-420
- /
- 2002
A New Way of Connecting Method Between Steel Pipe Pile and Concrete Footing
새로운 강관말뚝 머리 보강 공법 개발
Abstract
Recent experimental research results of connection method between steel pipe pile and concrete footing are provided based on various experimental observations. It gives a shedding light toward developing better and concrete connection method for steel pipe pile at the field application. In this study, the newly developed method is tested for compressive, pull put and combination load including moment with carefully designed monitoring system. The measured data show that new method have at least equivalent or better load resistant capacities compared with those of specified method in Korea Highway Corporation design code. It is also tried to define and investigate the load transfer mechanism for new method.