A Study on the Development of Work Activity Check List by Factor Analysis

요인분석을 통한 공종별 체크리스트 작성에 관한 연구

  • 이재옥 (원광대 대학원 건축공학과) ;
  • 윤여완 (원광대 건축공학과) ;
  • 김천학 (국무총리 국무조정실 안전관리개선기획단) ;
  • 양극영 (원광대 건축공학과)
  • Published : 2002.11.01

Abstract

The purpose of this study was to Estimation the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of construction field. So we rearrange the individual item of inspection list to match the Risk factor, The results of this study were as follows: The inspection list was rearranged at Risk checklist for Risk estimation. So that we estimate the Risk of individual construction method.